Sign in Subscribe

Conservation Commission approves Mill River Greenway project with revised stormwater plan

Conservation Commission · Meeting of March 5, 2026

Williamsburg Conservation Commission approves Mill River Greenway project with revised environmental protections. Chair Joe Rogers led approval of the South Main Street / Mill River Greenway Notice of Intent (DEP No. 342-0155) after VHB representatives presented revised stormwater and invasive species plans addressing prior public comments. The revised stormwater plan includes new curbing, catchbasins, and a pretreated outfall, improving on current conditions where untreated discharge flowed directly into the river.

In related action, the Commission issued a Positive 1 Determination for a proposed Accessory Dwelling Unit at 85 Mountain Street, requiring the applicant to file a Notice of Intent due to proximity to the 200-foot Riverfront Area of Beaver Brook. Commissioner Jim Ayres announced his resignation effective end of March.

In the full story:

  • The complete report — 608 words

Source: the Conservation Commission meeting of March 5, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Williamsburg News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Williamsburg News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe